Provisional structures are an essential component in overhead line construction to ensure grid stability and the safety of overhead line operation in the event of accidents or planned construction work. They provide a temporary solution for replacing damaged masts and maintaining the power supply by installing temporary sections of line. Cteam offers a modular system that has been specifically developed to enable quick and efficient assembly. CP provisional structures are suitable for voltage levels ranging from 110 kV to 380 kV, as well as different mast head designs. A notable feature is the ballast principle, which enables the product to be adapted flexibly to different ground conditions without the need for foundations or anchoring.

Advantages at a glance
Features
CP provisional structures offer a modular design and are adaptable to all common mast types. They also eliminate the need for anchors, ensuring the smallest possible footprint.
Voltage levels
CP provisional structures are suitable for voltage levels ranging from 110 kV to 380 kV
Fast assembly
Depending on the complexity, assembly of a CP provisional structure usually takes between 1-3 days.
Permanent use
Although temporary structures are designed for temporary use only, the CP pylon can be arranged for either temporary or permanent use.
Integration of existing masts
Existing masts can be transferred to the CP base sections or new masts can be erected on them, according to the way in which they have been designed.
Service areas
With its emergency pylons, Cteam offers a reliable solution for various applications in overhead line construction.
CP pylons in detail
The CP pylons from Cteam are available in various designs to meet the different requirements of overhead line construction. Each system has specific features.

CP-Light
Circuits
2x 110 kV
Cabling*
Al/St 265/35 (264-AL1/34-ST1A)
Bundle
Single cable
Mid tensile stress
43 N/mm²
Phase range
400 m
Weight range
min./max. 100m/500m
Wind/ice zone*/**
Wind zone 2 / ice zone 2
CP
Circuits
1x 380 kV
Cabling*
Al/St 265/35 (264-AL1/34-ST1A)
Bundle
Bundle of 4
Mid tensile stress
43 N/mm²
Phase range
400 m
Weight range
min./max. 100m/500m
Wind/ice zone*/**
Wind zone 2 / ice zone 2
CP-Heavy
Circuits
2x 380 kV
Cabling*
Al/St 265/35 (264-AL1/34-ST1A)
Bundle
Bundle of 4
Mid tensile stress
43 N/mm²
Phase range
400 m
Weight range
min./max. 100m/500m
Wind/ice zone*/**
Wind zone 2 / ice zone 2
CP lower section
Suitable for takeover of existing masts.
*As long as the basic static dimensions are not exceeded, the pylon can be used with different cable cross-sections or in different wind/ice zones.
**Full standard load; no standard reduction of wind/ice loads (project-related reductions are possible).







Download our brochure about provisional structures as an PDF.
Deployment planning of provisional structures reinvented – with our LVS
Our warehouse management system (WMS) has been specially developed to meet the industry-specific requirements of overhead line construction, combining planning reliability with real-time transparency.
Intelligent deployment planning of provisional structures with our tailor-made warehouse management system
Efficient project management begins with careful deployment planning, particularly in the complex environment of overhead line construction.
The system enables seamless inventory tracking. Each provisional structure is recorded in detail throughout its entire period of use, from delivery and downtime to return. This allows us know which materials are being used in which project at all times.
Another key benefit is that the software-supported evaluation of all current and planned projects highlights potential shortfalls at an early stage. This enables us to procure missing modules or components in good time and in an economically viable manner.We do this by taking a module-specific approach with foresight, tailored to the overall requirements. This minimises material bottlenecks and ensures smooth processing on the construction site.
If you want to make use of these advantages, contact us for advice.
As a reliable partner in overhead line construction, we are pleased to offer services relating to temporary solutions, including CP temporary solutions.

All your benefits at a glance:
Targeted deployment planning
Planning security with transparent material available - across all projects.
Seamless inventory tracking
Each provisional structure is recorded for each project - from delivery to return.
Early shortage recognition
Recognising bottlenecks before they occur - through system-supported inventory analysis.
Module-specific procurement
Only procure what is really needed, ensuring it is precise, in line with requirements and cost-optimised.
Optimised processes
It is the stock administration system that adapts to the processes in overhead line construction, not the other way around.