Overhead line construction

Planning, erecting and restoring overhead lines. We are a partner to all transmission and distribution grid operators and are also significantly involved in the realisation of many energy transition projects.

Experts for high-voltage lines

As specialist in overhead lines, we offer extensive solutions for high-voltage overhead lines. Our services include planning, erecting and commissioning overhead line masts, including underground cables when needed. With many years of experience at home and abroad, we are your reliable partner for reliable energy transmission.

We consider the specific requirements of each project, utilising the latest technologies and materials to ensure the highest levels of quality and efficiency. Our work contributes to the reliable supply of electricity and the expansion of the electricity grid in Germany.

Our services in overhead line construction

Learn more about our comprehensive overhead line construction services, covering everything from planning and installation to commissioning overhead and high-voltage lines.

mastmontage
Mast assembly
Our experts can erect all types of mast, including solid wall and concrete masts, to ensure the safe transmission of energy.
Read more
seilarbeiten
Cable work
Having your conductor cables and insulators professionally maintained ensures optimum performance and safety of your overhead lines.
Learn more
Icon 23
Upgrade
We modernise and reinforce existing overhead lines in order to extend their service life and minimise the risk of failure.
Read more
fundamentbau
Foundations
We lay the foundations for a stable mast construction that is adapted to the soil and site conditions.
Learn more
Icon 21
Provisional structures
Quick and reliable installation of emergency pylons during maintenance or repair work to ensure the energy supply.
Learn more

Cable work and insulators

Our experience team carries out cable work under consideration of all safety standards. Using high-quality insulators ensures the reliability of your overhead lines.

We work with different voltages to ensure optimum electricity transmission over long distances. We use cutting-edge technologies and materials to minimise the impact on the environment.

Cteam power line project: equipment suspended from a transmission tower.
Professional man smiling, representing Cteam's expertise in consulting and plant construction projects.
Stefan Horb
Head of division for overhead lines construction south
1/5

“My advice to newcomers is this: there will be days when you ask yourself whether it's really worth it. You'll ask yourself, “Do I really want to do this?” But if you work with a team that feels like a unit, where you really fit in and can perform well, then you'll want to stick with it. That's when things start to become enjoyable. That's what line construction is all about. It's about teamwork. That's our strength.”

Smiling Cteam professional for consulting and plant construction.
Volker Noack
Head of division for overhead lines construction west
2/5

“For us, every line we build represents more than just technology; it symbolises our passion, our team spirit, and our pride in being part of a company that is shaping the future with dedication and expertise. Our lines carry power. Our values endure through the generations.”

Cteam professional smiling, representing our consulting and plant construction expertise.
Yannik Schwind
Head of division for overhead lines construction NBR
3/5

“The major grid reinforcement project Badische Rheinschiene (NBR) is setting standards in German overhead line construction in terms of scope, execution time and complexity. With us as a strong and reliable partner with the highest possible customer orientation, we are realising the project with the best solutions to full customer satisfaction.”

Cteam expert ready to provide consulting and plant construction solutions.
Nico Wulf
Head of division for overhead lines construction north
4/5

“Today’s overhead line construction projects tend to be infrastructure projects, with an increasing focus on project management. It is important to continue professionalising this area without compromising the skills and flexibility of the installation personnel.”

10915_Frank_Butters
Frank Butters
Head of division for overhead lines construction east
5/5

“Overhead line construction in times of energy transition is a key industry for a sustainable future. Being able to actively support and shape this process is a source of pride and joy.”

Get in touch now and get your project started

Our team of experts is always here to help.

Team of Cteam construction workers at a power line project site.

The advantages of our overhead lines construction services

Find out about the advantages of our overhead line construction services and how they help to ensure reliable energy transmission.

1 Plenty of experience and skill in overhead line construction

Our years of experience guarantees you the highest quality and reliability in every project.

2 Using the latest technologies and materials

We rely on innovative technologies and premium materials for the best service.

3 Individual planning and consulting on-site

Our experts advise your personally and develop customised solutions to meet your requirements.

4 Extensive services from assembly to commissioning

We will support you throughout the process, from installation to commissioning and beyond, to ensure your system operates smoothly.

Projects in overhead line construction

Cteam has successfully completed many projects in the area of foundations. These projects demonstrate our ability to provide customised solutions for a wide range of requirements. The following projects showcase the full extent of our capabilities.

Cteam high-voltage power lines and towers against a cloudy sky, representing electricity grid infrastructure.
Building high-voltage power lines and substation infrastructure, a Cteam construction site with pylons and crane.
Overhead line construction by Cteam, building a lattice tower.
Power line construction and maintenance infrastructure project by Cteam.

Kühmoos-Daxlanden | Grid reinforcement Badische Rheinschiene (NBR)

Bertikow - Neuenhagen “Uckermark line” lot 2

Redwitz-Mechlenreuth

LEW DIV 11351 O11/E6 Sontheim

Project duration:

09/2022 – 09/2025 (36 months)

Length of line:

2.7 km

Foundations:

Deep foundation with large bored piles, watertight pit shoring

Total weight of masts:

1360 t / 4000 t CP emergency pylons

Cabling:

Cable pull, regulation of the conductor cables and fibre optic ground cable and fibre optic cable

Project duration:

09.2022 – 03.2024

Total length:

23.3 km

Foundations:

56 slabs with approx. 7,756 m³ of concrete and 18 deep foundations with bored piles

Total weight of masts:

2,484 tonnes

Cabling:

2 x 3 x 4 264-AL1/34-ST1A with 2 systems, bundle of 4

Customer:

TenneT TSO GmbH

Project duration:

June 2021 – June 2023 (approx. 24 months)

Length of line:

380-kV line: approx. 22 km, 110-kV line: approx. 5 km

Foundations:

20 x single large bored piles, 1 x twin bored pile, approx. 4,300 m³ concrete

Cabling:

New construction with 565-AL1/72-ST1A bundle of 4 and dismantling with single cable / bundle of 2

/4
Cteam high-voltage power lines and towers against a cloudy sky, representing electricity grid infrastructure.
/4

Kühmoos-Daxlanden | Grid reinforcement Badische Rheinschiene (NBR)

Project duration:

09/2022 – 09/2025 (36 months)

Length of line:

2.7 km

Foundations:

Deep foundation with large bored piles, watertight pit shoring

Total weight of masts:

1360 t / 4000 t CP emergency pylons

Cabling:

Cable pull, regulation of the conductor cables and fibre optic ground cable and fibre optic cable

To the reference
Building high-voltage power lines and substation infrastructure, a Cteam construction site with pylons and crane.
/4

Bertikow - Neuenhagen “Uckermark line” lot 2

Project duration:

09.2022 – 03.2024

Total length:

23.3 km

Foundations:

56 slabs with approx. 7,756 m³ of concrete and 18 deep foundations with bored piles

Total weight of masts:

2,484 tonnes

Cabling:

2 x 3 x 4 264-AL1/34-ST1A with 2 systems, bundle of 4

To the reference
Overhead line construction by Cteam, building a lattice tower.
/4

Redwitz-Mechlenreuth

Customer:

TenneT TSO GmbH

Project duration:

June 2021 – June 2023 (approx. 24 months)

Length of line:

380-kV line: approx. 22 km, 110-kV line: approx. 5 km

Foundations:

20 x single large bored piles, 1 x twin bored pile, approx. 4,300 m³ concrete

Cabling:

New construction with 565-AL1/72-ST1A bundle of 4 and dismantling with single cable / bundle of 2

To the reference
Power line construction and maintenance infrastructure project by Cteam.
/4

LEW DIV 11351 O11/E6 Sontheim

To the reference

Experience Cteam – the people. Tasks. Perspectives.

What makes the difference in our work? What drives us? In our video, we hear from colleagues in overhead line construction who offer authentic insights into their everyday lives and their passion for their work. Whether you are a prospective team member, a long-standing partner or an existing employee, here you will get to know the Cteam team in a very personal way.

Freileitung_sub_EN_v2_1
ENERGY, WHERE IT IS NEEDED

We provide a reliable and safe electricity supply, delivering passion and precision in overhead line construction.

More on the topic of sustainability
Visualizing modern energy and telecommunications networks for Cteam projects.

FAQ: Frequently asked questions

How high are overhead line masts in general?

Overhead line masts can range between 30 and 100 metres depending on the voltage and location.

What are the advantages of overhead lines in comparison to ground cables?

Overhead lines are less expensive and easier to maintain than ground cables. They allow flexible power transmission over long distances.

Which mast types are used for overhead line construction?

The type of mast used depends on the requirements and conditions, and can be solid wall, concrete or wooden.

How does overhead line construction contribute towards the power supply?

Overhead lines are a vital part of the infrastructure used to transmit electricity from power stations to cities and industrial areas.

What impact does overhead line construction have on the environment?

We minimise the impact on the environment and increase acceptance through careful planning and the use of modern technologies.

What does restoring overhead lines involve?

The restoration process involves repairing masts, cables and insulators in order to repair any damage and extend their service life.

How long does take to build an overhead line?

The duration varies depending on factors such as the length of the route, the terrain and the specific requirements. However, precise planning enables efficient processes.

Does your company also offer solutions for medium voltage?

Yes, we offer services for high and medium voltage and adapt our solutions to the respective voltages and requirements.