Project details
Project duration:
09.2022 - 11.2023
Length of line:
21.5 km
Foundations:
56 slabs with approx. 7,756 m³ & 18 deep foundations with bored piles
Total weight of masts:
2,532 t
Cabling:
2 x 3 x 4 x 434-AL1/56-ST1A & 2 systems, bundle of 4
Special features:
Two-system provisional structure between existing mast M215 - M216 & single-system through-connection at Köckritz triangle
This project showcases Cteam’s expertise and adaptability in providing ground protection solutions, as well as our dedication to maintaining the highest safety and quality standards. By successfully implementing these extensive measures, we are strengthening the region's power grid infrastructure in a sustainable way while minimising the ecological impact.