Skip directly to content

Project 380 kV line Weida - Remptendorf lot 1

This project involved implementing several innovative solutions to ensure the infrastructure was installed efficiently and safely.

Power line construction and maintenance infrastructure project by Cteam.

Short facts

Country

Germany

Service area

Overhead line construction

Project details

Project duration:

09.2022 - 11.2023

Length of line:

21.5 km

Foundations:

56 slabs with approx. 7,756 m³ & 18 deep foundations with bored piles

Total weight of masts:

2,532 t

Cabling:

2 x 3 x 4 x 434-AL1/56-ST1A & 2 systems, bundle of 4

Special features:

Two-system provisional structure between existing mast M215 - M216 & single-system through-connection at Köckritz triangle

This project showcases Cteam’s expertise and adaptability in providing ground protection solutions, as well as our dedication to maintaining the highest safety and quality standards. By successfully implementing these extensive measures, we are strengthening the region's power grid infrastructure in a sustainable way while minimising the ecological impact.

Impressions of the project

High-voltage power transmission pylon, illustrating Cteam's expertise in power line construction and assembly.
Cteam team constructs lattice pylon for energy infrastructure.
Overhead line construction site featuring Cteam cable reels and stringing equipment.
Cteam overhead line construction site with large cable reels for conductor installation.
Cteam experts constructing massive scaffolding structure for industrial plant or project.
Excavators perform excavation work on a construction site, demonstrating Cteam's foundation engineering expertise.