Short facts
Country
Germany
Service area
Overhead line construction
Project details
Project duration:
12 weeks
Work
Existing structure: foundation reinforcement + steel restoration, new mast in line route
Length of line:
Affected section mast 55 - 57: approx. 0.72 km
Foundations:
Mast no. 55: foundation: upgrade with a flood slab block foundation (approx. 340 m³). Mast no. 55a: flood slab block foundation (new build) (approx. 330 m³).
Total weight of masts:
Steel restoration mast 55: approx. 3.6 t steel, new build mast 55a: approx. 15.4 t steel
Cabling:
Conductor cable: Al/St 240/40 ESLK: AY/AW 216/33
Special features:
Flood foundations with a height of approx. 6 m, installation of the new mast 55a in the cable route between masts 55 and 56
Impressions of the project