LEW DIV 11351 O11/E6 Sontheim. 110 kV line. Lachen-Honsolgen installation 11351

Power line construction and maintenance infrastructure project by Cteam.

Short facts

Country

Germany

Service area

Overhead line construction

Project details

Project duration:

12 weeks

Work

Existing structure: foundation reinforcement + steel restoration, new mast in line route

Length of line:

Affected section mast 55 - 57: approx. 0.72 km

Foundations:

Mast no. 55: foundation: upgrade with a flood slab block foundation (approx. 340 m³). Mast no. 55a: flood slab block foundation (new build) (approx. 330 m³).

Total weight of masts:

Steel restoration mast 55: approx. 3.6 t steel, new build mast 55a: approx. 15.4 t steel

Cabling:

Conductor cable: Al/St 240/40 ESLK: AY/AW 216/33

Special features:

Flood foundations with a height of approx. 6 m, installation of the new mast 55a in the cable route between masts 55 and 56